Little Creatures Brewery Geelong
- Location: Little Creatures Brewing
- Complete: November 2024
- Visit: http://www.littlecreatures.com.au
The Problem
The Solution
The Challenges
Client Response
Little Creatures Geelong was pleased with the proposed solution and agreed to proceed immediately. After the project was completed, they expressed their satisfaction, noting that the installation had effectively eliminated the issue of unauthorised access. The client was particularly relieved that the safety concerns regarding public entry into restricted areas were fully addressed. Since the implementation, there have been no reported safety breaches, and the barriers continue to serve their purpose effectively.
Ongoing Partnership:
Barrier Group and Little Creatures Brewery have maintained a robust and collaborative partnership that has proven beneficial for both entities. In late 2024, this relationship was further solidified through a series of projects to enhance safety and accessibility within the brewery's premises.
During this time, Little Creatures Brewery utilised Barrier Group's Linemarking Service. The main goal was to create a new pedestrian walkway. This walkway was carefully designed to keep pedestrians safe in busy areas around the brewery. It lets them move freely and securely without accidents.
Along with the walkway, the Barrier Group Linemarking Specialists also installed a new centre line. This line helps mark lanes and guide vehicles. It reduces the chance of collisions and improves traffic flow. They also added directional arrows to give clear guidance to drivers. This helps drivers navigate the area with confidence.